Configure sparging and electrolysis
-
On the Configuration page, check
config.inicontains the following. The installer adds4=relayand the[electropioreactor.config]section; channels 2 and 3 were set in Nutrient solution.[PWM] # map the PWM channels to externals. # hardware PWM are available on channels 1 & 3. 1=stirring 2=waste 3=media 4=relay 5=heating [electropioreactor.config] electrolysis_power=2.5 ; LED D intensity (0-10 %, clamped at runtime) sparge_duration_seconds=10.0 ; solenoid open time per cycle (s) sparge_interval_minutes=60.0 ; cycle frequency (min) od_pause_after_sparge_seconds=5.0 ; OD settle window after sparge ends (s) -
Open electroPioreactor from Activities on the Manage screen.
-
Set a test Bubbling gas through the culture. Here, CO₂ from the cylinder flows down the anode on a timer set in the electroPioreactor job. in the job’s Settings panel: interval 1 minute, duration 1 second.
-
Listen for the An electric valve on PWM channel 4 that opens to sparge. It must be 3-way venting (3/2), so the line vents when it closes. clicking open at each sparge.
-
Open the A fine-adjustment valve on the solenoid's front port. It sets how fast CO₂ flows; turn clockwise to close. while watching the vial, until the bubbling looks right.
-
Set your working sparge interval and duration in the job’s Settings panel. The MEP runs 3 seconds every hour.
Notes
- All four parameters are editable live from Settings.
od_pause_after_sparge_secondsapplies from the next sparge. - Splitting water with an electric current: hydrogen at the cathode, oxygen at the anode. It supplies the hydrogen the HOB grow on. power stays clamped to 10% at runtime to protect the electrodes.
Check your work
During the test Bubbling gas through the culture. Here, CO₂ from the cylinder flows down the anode on a timer set in the electroPioreactor job., what do you hear and see each minute?
Check the cylinder is open (pin screw fully down) and the A fine-adjustment valve on the solenoid's front port. It sets how fast CO₂ flows; turn clockwise to close. is not closed.
Check the An electric valve on PWM channel 4 that opens to sparge. It must be 3-way venting (3/2), so the line vents when it closes. lead is in One of the HAT's five switched power outputs. In this build: 1 stirring, 2 media pump, 3 waste (product) pump, 4 CO₂ solenoid (relay), 5 heating. 4,
4=relayis inconfig.ini, and the 12 V supply is connected.Show the answer
Answer: A click, then bubbles entering the vial
- If you see A click, but no bubbles entering the vial: Check the cylinder is open (pin screw fully down) and the A fine-adjustment valve on the solenoid's front port. It sets how fast CO₂ flows; turn clockwise to close. is not closed.
- If you see No click, and no bubbles entering the vial: Check the An electric valve on PWM channel 4 that opens to sparge. It must be 3-way venting (3/2), so the line vents when it closes. lead is in One of the HAT's five switched power outputs. In this build: 1 stirring, 2 media pump, 3 waste (product) pump, 4 CO₂ solenoid (relay), 5 heating. 4,
4=relayis inconfig.ini, and the 12 V supply is connected.
When the An electric valve on PWM channel 4 that opens to sparge. It must be 3-way venting (3/2), so the line vents when it closes. clicks shut, what does the bubbling do?
Check the The dial on the front of the solenoid. 0 is normal (closed without power); 1 holds the valve open. is at 0.
Show the answer
Answer: Stops with the click
- If you see Carries on after the click: Check the The dial on the front of the solenoid. 0 is normal (closed without power); 1 holds the valve open. is at 0.
Step checked